Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0124-00032
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2024 | Site Zoning | APPROVED | |||
02/05/2024 | Commercial Mechanical | NOT REQUIRED | |||
02/05/2024 | Commercial Plumbing | NOT REQUIRED | |||
02/02/2024 | Site Engineering | NOT REQUIRED | |||
02/05/2024 | Water - PDSD | NOT REQUIRED | |||
02/05/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
02/01/2024 | Commercial Electrical | REQUIRES RESUBMIT | The plans submitted are stamped, "NOT FOR CONSTRUCTION" Please resubmit the correct plans. |
||
02/05/2024 | Commercial Structural | REQUIRES RESUBMIT | Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. 1. The submitted drawings are the same exact drawings as the fire damage repair drawings in permit TC-COM-1122-00023 that was already approved and issued. 2. Please submit a set of drawings that reflects the finding established in the Structural Report done by Coronado Engineering dated December 1, 2023 where it mentions, "Recommendations: Based on our observations and review we recommend the entire walkways on east and westside be replaced in kind. 1. Replace any rotted wood member. 2. Fix the gutter system to avoid water damage to exterior walls." 3. Please resubmit. |
||
01/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
01/08/2024 | PDSD Application Completeness | REVIEW COMPLETED |