Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0124-00004
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/10/2025 | Commercial Mechanical Standard | APPROVED | |||
| 05/29/2025 | Outdoor Lighting Standard | APPROVED | |||
| 06/10/2025 | Site Zoning Standard | APPROVED | |||
| 06/09/2025 | Water - PDSD Standard | APPROVED | |||
| 06/18/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 06/18/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/10/2025 | Commercial Building Standard | REQUIRES RESUBMIT | For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179 all applicable comments followed by the initials (BM) 1. Sheet g1.00 Building section identified as existing to remain has not been identified in code analysis for occupancy or occupant load. Clarify 2018 IBC 107.2.1 (BM) 2. Sheet g1.00 Revision letter note #2, states food no longer served, clarify A2 occupancy identified as open dinning 2018 IBC 303.3 & table 2902.1 for required plumbing fixtures. (BM) 3. Sheet d1.00 Clarify note for NW building section noted for existing walls to removed. Other plan notes identify existing to remain. 2018 IBC 107.2.1 (BM) 4. Sheet a1.01 Revision letter note #2 states food no longer being served. serving kitchen is still identified on plans. Clarify 2018 IBC 107.2.1 (BM) Note: grease interceptor noted to be removed for no food served. 5. Sheet a2.01 Per prior approval red-line notes on plan sheet a1.01, identify ramp slope and handrail to comply IBC 1012.2 & 1012.8 (BM) |
||
| 06/10/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | 1. Sheet e2.0 Exit sign and EM egress light fixtures are still identified above removed door. Remove from plan. 2018 IBC 107.2.1 (BM) | ||
| 06/10/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Sheet P0 Rear building section is noted on plan sheets for existing to remain. Plumbing demo plan still identifies existing fixtures to be removed and capped. Clarify 2018 IBC 107.2.1 (BM) | ||
| 06/03/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire alarm monitoring of the fire sprinklers back flow preventer valves shall comply with section 903.4 and 903.41 of the 2018 IFC. fire extinguishers types and amount shall comply with section 906 of the 2018 IFC. If equipped with kitchen hoods; Fire suppression requires a separate permit. CO2 systems requires an operational permit. |
||
| 05/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |