Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0123-00550
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/11/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0123-00550 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 2. Refer to Structural Drawing Sheet 1 of 109. The Seismic Parameters shown does not match with as shown on Structural Drawing S1.0 Section marked A, Design Criteria. Investigate and make revisions as needed. 3. Refer to Structural Drawing Sheet 1 of 109. Wind Exposer is called as B which does not match with as shown (Wind Exposure C) on Structural Drawing S1.0 Section marked A, Design Criteria. Investigate and make revisions as needed. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. Sheet A2.1: The cover sheet indicates that separated mixed use is being used. According to Table 508.4, a 1 hour rated assembly will be required between the business and assembly occupancies. Wall Type F is not indicated as such. Provide the chosen UL listed assembly being used for this separation. MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied E0.0 ELECTRICAL COVER SHEET: No electrical issues E0.1 ELECTRICAL SPECIFICATIONS: No electrical issues E2.0 ELECTRICAL PLAN: Need to provide one service receptacle next to each power panel per NEC 210.64. Should provide a couple of service receptacles in each space. Need to provide Combo exit signage at each exit door and emergency lighting for an obvious egress path. Need to provide some type of minimal stumble lighting (stumble lighting could also incorporate emergency lighting to satisfy egress lighting requirement). Need to provide exterior illumination lighting calculations to satisfy Tucson exterior lighting restrictions. If any unit is occuppied where working interior lighting is provided, an interior lighting calculation would also need to be submitted to show IECC compliance for such space. Sheet Note #6 seems to show primary service entrance, but calls out as irrigation circuit. Confirm or correct as required. E5.0 SINGLE LINE DIAGRAM: Panel H has two AIC ratings. Select only one. Should call out receptacle circuits used ie rooftop receptacle circuit #7. Should call out additional circuits where used ie need a receptacle by the power panel if not piggybacked onto rooftop receptacle circuit. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Provide civil site utility plans as stated on plan page P1.0 for continuation of sewer & water service. -IPC 106.3.1 2). Gas note on detail 101 on plan page M1.0 doesn't correlate with package unit schedule & plumbing are also not showing any gas piping? plan pages need to correlate. Remove note or add gas illustrations & information. -IFGC 106.3.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 03/07/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 03/06/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0123-00550 6601 E Grant Rd Mixed Use – C-1/C-2 (1st Review) TRANSMITTAL: March 6, 2023 This site is located in C-1/C-2 zone (UDC 4.7.20 & .21) Mixed use is an allowed use in the zone. 1. Zoning has reviewed the plan for compliance with development package (DP) DP22-0241, and although it appears that the building plans match the DP, until the DP has been approved by all review agencies Zoning cannot approve this plan. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 03/09/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 02/10/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |