Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0123-00535
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/05/2026 | Commercial Building Standard | APPROVED | |||
| 01/15/2026 | Commercial Electrical Standard | APPROVED | |||
| 02/05/2026 | Site Zoning Standard | APPROVED | |||
| 02/03/2026 | Water - PDSD Standard | APPROVED | |||
| 01/15/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 02/03/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 02/05/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/03/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. | ||
| 02/03/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide specifications for the treat sink, P3. Reference: Sections 303.4 and 402, IPC 2018. 2. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washers). Reference: Section 604.9, IPC 2018. 3. Specify the proposed sump pump and provide a detail of the installation of the sump pump, including the check valve, shut-off valve and the connection to the 2” gravity drain. Reference: Sections 712.1 through 712.3, IPC 2018. 4. Clarify how and where the new 2” gravity drain connects to the existing building drain. Reference: Section 712.3.5, IPC 2018. |
||
| 02/05/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 01/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |