Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0123-00507
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/02/2023 | Site Zoning | APPROVED | |||
| 03/07/2023 | Site Engineering | NOT REQUIRED | |||
| 03/08/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/21/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0123-00507 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied Elevation views not submitted. BUILDING REVIEW COMMENTS: Denied Elevation views not submitted. Need the energy code compliance report. The bedroom windows do not meet the requirements for egress windows. A sliding window with a rough opening of only 36" wide would provide a clear opening of only 16" wide - minimum 20" is required. Occupancy calculations should be 1 person per 200 sf of gross area (per definition). Verify that the ventilation and lighting requirements of Chapter 12 are met. MECHANICAL REVIEW COMMENTS: Denied Elevation views not submitted. Need the energy code compliance report. The bedroom windows do not meet the requirements for egress windows. A sliding window with a rough opening of only 36" wide would provide a clear opening of only 16" wide - minimum 20" is required. Occupancy calculations should be 1 person per 200 sf of gross area (per definition). Verify that the ventilation and lighting requirements of Chapter 12 are met. ELECTRICAL REVIEW COMMENTS Denied Need the energy code compliance report. The water heater is shown on the plumbing plans as being 208V but the building service is 120/240V. Show tamper resistant receptacle details on electrical plans. Show the subpanel feeder sizes. PLUMBING REVIEW COMMENTS: DeniedThe water heater is shown on the plumbing plans as being 208V but the building service is 120/240V. Include sprinkler details, backflow preventers, etc. in plumbing drawings. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 03/08/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 02/08/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |