Permit Number: TC-COM-0123-00471
Parcel: 13002003B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0123-00471
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/28/2023 Site Zoning APPROVED
03/07/2023 Site Engineering NOT REQUIRED
03/08/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
02/15/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0123-00471

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
The proposed building location shown on the GIS views on pages T1.0 and SP1.0 do not match the location of the building shown on the site plan.
Include a list of special or deferred inspections.


BUILDING REVIEW COMMENTS:
Denied
The proposed building location shown on the GIS views on pages T1.0 and SP1.0 do not match the location of the building shown on the site plan.
Show all emergency lighting (including the exit discharge lighting) on the electric and reflected ceiling plans.
Page A1.4 references 2012 IBC in the accessibility notes - needs to be 2018 IBC.
Need the COMcheck energy compliance for the interior lighting, exterior lighting, mechanical, or envelope as applicable.
Include a list of special or deferred inspections.


MECHANICAL REVIEW COMMENTS:
Denied
Need to include the existing and new mechanical equipment, exhaust fans, and ducts on reflected ceiling and MEP pages.
Need the COMcheck energy compliance for the interior lighting, exterior lighting, mechanical, or envelope as applicable.


ELECTRICAL REVIEW COMMENTS
Denied
Show all emergency lighting (including the exit discharge lighting) on the electric and reflected ceiling plans.
Include the panel schedules for all new circuits and feeders.
Need the COMcheck energy compliance for the interior lighting, exterior lighting, mechanical, or envelope as applicable.


PLUMBING REVIEW COMMENTS:
Denied
Sprinklers are shown installed on some pages but not installed on the cover sheet.
Need to show the new or replaced/repaired plumbing DWV, supply piping, water heater, fixtures, etc.


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
03/08/2023 Fire New Construction REQUIRES RESUBMIT Sprinklers are shown installed on some pages but not installed on the cover sheet, please clarify.
patricia.shelton@tucsonaz.gov
520.837.7082
02/08/2023 PDSD Application Completeness REVIEW COMPLETED