Permit Number: TC-COM-0123-00462
Parcel: 116210220

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0123-00462
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2023 Site Engineering APPROVED
08/11/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/27/2023 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: Wyatt Berger
Lead Planner

PROJECT: TC-COM-0123-00462
1000 West Congress Street – C-1
Pueblo Vida (3rd Review)

TRANSMITTAL DATE: July 27, 2023

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Zoning has reviewed building permit TC-COM-0123-00462; however, zoning cannot approve this building permit until development package case number TD-DEV-1222-00074 has been approved by all review agencies.

2. Sheet TS does not match the site plan approved through development package case number TD-DEV-1222-00074. Of particular concern are the proposed entry canopy, fireplaces, walk-in refrigerator, water harvesting cistern, and tree rings shown on Sheet TS, as well as the removal of the required short- and long-term bicycle parking facilities. Either TD-DEV-1222-00074 will need to be revised to show these changes, or these changes shall be removed from the building permit plan set.

Contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951 should you have questions about my transmittal.
07/24/2023 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 3/16/2023 4:09:52 PM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall
not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 7/19/2023 2:36:58 PM



Mechanical(M) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 7/19/2023 2:37:11 PM




Electrical(E) Reviewer (from previous submittal TUC9182001.030623)
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 3/15/2023 3:06:56 PM


Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/22/2023 11:13:59 AM
Second Plumbing Review: BLDG #1** SEE APPROVED APPEAL FOR GENDERLESS RESTROOM BY CBO CLAYTON TREVILLYAN **** SEE UPLOADED DOCUMENT=SUBJECT TO FIELD INSPECTIONS****
1). OK
2).OK
3).OK -This occupancy type & load requires separate mens & womens restrooms, update all affected pages' -IPC 403.2**
SEE APPROVED APPEAL FOR GENDERLESS RESTROOM BY CBO CLAYTON TREVILLYAN **** SEE UPLOADED
DOCUMENT=SUBJECT TO FIELD INSPECTIONS****
4).OK
5). OK-Add fixture spacing measurements for the lavs & toilets on plan page A4.2 -IPC 404.2, 405.3.1=OK SUBJECT TO FIELD INSPECTIONS****
6). OK
7). OK
8). OK
08/11/2023 Historic REVIEW COMPLETED Historic demolition documentation provided.
07/18/2023 PDSD Application Completeness Express REVIEW COMPLETED