Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0123-00414
Parcel: 128100560

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0123-00414
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2023 Site Zoning APPROVED
03/30/2023 Site Engineering NOT REQUIRED
03/30/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
03/24/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0123-00414


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1) Include lists of separate or deferred submittals.
2) Detail the uses of the adjacent occupancies and any fire wall separation required for mixed occupancies.
3) Include the actual and allowable area, height, and number of stories for the mixed occupancies.
4) Include the details for the attachment/reinforcement of the heat pumps to the ceiling joists.


BUILDING REVIEW COMMENTS:
Denied
1) Occupant loads of the conference, meeting, dining, lobby and other similar areas of assembly are to be calculated at 1 person per 15 sf per Table 1004.5.
2) Calculate the number of occupants in the new and existing areas sharing the use of the existing toilet rooms/plumbing fixtures to determine the number of fixtures required.
3) Need a COMcheck energy compliance report for the new mechanical equipment and the interior lighting.
4) Include lists of separate or deferred submittals.
5) Detail the uses of the adjacent occupancies and any fire wall separation required for mixed occupancies.
6) Include the actual and allowable area, height, and number of stories for the mixed occupancies.
7) Show the path to the accessible toilet rooms, drinking fountain, and required signage.
8) Show the emergency lights and exit signs along the egress path.
9) Include the details for the attachment/reinforcement of the heat pumps to the ceiling joists.


MECHANICAL REVIEW COMMENTS:
Denied
1) Need a COMcheck energy compliance report for the new mechanical equipment and the interior lighting.
2) Include the spec sheets/installation instructions for the heat pumps.
3) Include the details for the attachment/reinforcement of the heat pumps to the ceiling joists


ELECTRICAL REVIEW COMMENTS
Denied
1) Need a COMcheck energy compliance report for the new mechanical equipment and the interior lighting.
2) Show the emergency lights and exit signs along the egress path.


PLUMBING REVIEW COMMENTS:
Denied
1) Occupant loads of the conference, meeting, dining, lobby and other similar areas of assembly are to be calculated at 1 person per 15 sf per Table 1004.5.
2) Calculate the number of occupants in the new and existing areas sharing the use of the existing toilet rooms/plumbing fixtures to determine the number of fixtures required.
3) Show the path to the accessible toilet rooms, drinking fountain, and required signage.


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
03/27/2023 Fire New Construction REVIEW COMPLETED
03/13/2023 PDSD Application Completeness REVIEW COMPLETED