Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0123-00411
Parcel: 137055850

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0123-00411
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/01/2023 Site Engineering APPROVED
02/07/2023 Site Zoning APPROVED
02/07/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
01/26/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0123-00411

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
CONDITIONALLY APPROVED
This approval is for the pool and spa only as noted in the scope of work on the drawings. All other work shall be indicated under a separate permit including but not limited to site engineering and drainage, required safety barriers (fencing), site work and utilities.

BUILDING REVIEW COMMENTS:
CONDITIONALLY APPROVED
This approval is for the pool and spa only as noted in the scope of work on the drawings. All other work shall be indicated under a separate permit including but not limited to site engineering and drainage, required safety barriers (fencing), site work and utilities.

MECHANICAL REVIEW COMMENTS:
CONDITIONALLY APPROVED
This approval is for the pool and spa only as noted in the scope of work on the drawings. All other work shall be indicated under a separate permit including but not limited to site engineering and drainage, required safety barriers (fencing), site work and utilities.

ELECTRICAL REVIEW COMMENTS
CONDITIONALLY APPROVED
This approval is for the pool and spa only as noted in the scope of work on the drawings. All other work shall be indicated under a separate permit including but not limited to site engineering and drainage, required safety barriers (fencing), site work and utilities.

PLUMBING REVIEW COMMENTS:
DENIED
PROVIDE HEATER GAS PIPING DETAILS AND SIZING CALCULATIONS.
SHOW THE HEATER RELIEF PIPE DETAILS.
SHOW THE EMERGENCY PUMP SHUT-OFF SWITCH DETAILS.


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
01/19/2023 Fire New Construction REVIEW COMPLETED
01/17/2023 PDSD Application Completeness REVIEW COMPLETED