Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM08142
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/22/2022 | Site Engineering | APPROVED | |||
| 11/01/2022 | Site Zoning | APPROVED | |||
| 11/26/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/02/2022 | External Reviewers - Willdan | REQUIRES RESUBMIT | Activity Number: T22CM08142 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. DENIED: Sheet g1.2 Is this aprt of an accessible path of travel from building? Sheet X1.0 Provide Construction Type Provide Occupancy TypeProvide square footage of this TIProvide Path of travel to the public way. Sheet X1.0 Provide Occupant Load for each area of the unit. Sheet A1.0 Provide Spec's on Carpet that it meets ADAAG requirements. Sheet A1.0 Define area of new work on floor plan. Sheet A1.0 Provide proper door pull clearance per ADAAG Sheet A1.0 Identify location of accessible Check out window,Show required clear floor space. Sheet A1.0 Provide details for stairs showing existing handrails to verify ADAAG compliance Sheet A1.0 Provide detail of new concrete slab. Provide concrete strength required. Show any required footing and details. Sheet A1.1 Show where the ramp connects to accessible parking and the public way. Sheet a2.0 Provide details for new and repairing acoustical ceiling. Provide Manufacturers Specifications on T-Bar Grid. Sheet A7.1 provide details for new Handrails.Provide structural Details of the attachment. Show how the plastic panels attach. Sheet 8.0 Provide cut sheet for Hardware showing it complies with ADAAG Sheet a9.0 Provide handrails that complies with ADAAG Sheet MO Identify work being proposed under this TI. Show location of all mechanical equipment. If any new units are installed on existing roof provide documentation roof can support the additional loads. Sheet P1 Provide detail for slab repair for new plumbing. Sheet P3 Show ADAAG clearances for handsnik Sheet ep701 Identify Panels feeding power to area of new construction If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 11/26/2022 | Fire New Construction | REQUIRES RESUBMIT | Resolve building comments |