Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM08117
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/09/2022 | Commercial Electrical | APPROVED | |||
01/05/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/05/2023 | Commercial Building | REQUIRES RESUBMIT | General 1) This is a commercial project and shall comply with 2018 IBC. Update reference on sheet (as.01). |
||
12/13/2022 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The 2018 International Mechanical Code with Local Amendments and the 2018 International Energy Conservation Code (Residential Section) are the relevant codes for this project, not the 2018 IRC. Revise the Mechanical Plan Notes and the Whole House Ventilation Schedule as needed. 2. Ventilation for kitchens in private dwellings requires a minimum of 25 CFM (continuous operation while occupied) or 100 CFM (intermittent operation) of mechanical exhaust per room. Reference: Section 403.3.2.3 and exception 1, Section 505.3, IMC 2018. |
||
12/13/2022 | Commercial Plumbing | REQUIRES RESUBMIT | 1. The 2018 International Plumbing Code with Local Amendments and the 2018 International Energy Conservation Code (Residential Section) are the relevant codes for this project, not the 2018 IRC. Revise the Plumbing Plan Notes and the Whole House Ventilation Schedule as needed. 2. Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018. |