Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - T22CM07950
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/12/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/30/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM07950 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 10/31/2022 2:26:07 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Structural(S) Reviewer (from previous submittal TUC8605001.101822) Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 10/31/2022 2:26:07 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Denied Reason: Date Completed : 5/26/2023 8:07:01 PM 1. Show how you are bringing fresh outside ventilation air to the 6 FCU sheet M2.01 (IMC2018,106.3.1) Complied 2. Provide ventilation calculations (IMC2018,403.3.1.1.1) 1. Zone 2 requires 1290 cfm of outside air and it is being ventilated by FC-2 which is capable of 1150 total cfm's you can only bring in 20% outside air to the total capacity the numbers are way off please correct. 2. storage areas require ventilation at .06 cfm per square foot please correct. Not Complied 3. Your plans shall be made clear in the mail, study area, it is cluttered and not clear sheet M2.01 (IMC2018,106.3.1) Complie Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 5/9/2023 6:44:40 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 5/29/2023 3:06:01 PM Third Plumbing Review: OK Subject to field inspections 1). OK 2). Coffee water connection will need an ASSE 1024 Backflow -IPC 608.17.1.2 ,Subject to field inspections 3). OK 4). Ok 5). SK-1 sink selection not detailed, will need to meet IPC section 303, Subject to field inspections |
||
06/12/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/24/2023 | PDSD Application Completeness | REVIEW COMPLETED |