Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM07933
Parcel: 14036017D

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM07933
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/28/2022 Commercial Plumbing APPROVED Fuel Canopy
12/12/2022 Bldg Permits - Post Review PENDING ASSIGNMENT
11/02/2022 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TT22CM07932/CONVENIENT STORE AND T22CM07933/FUEL CANOPY

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Refer to Drawing A-XC120 and Geotechnical Report page 4, Table 3.3.1 Seismic Parameters. There is a discrepancy in the numbers, investigate and make revisions as needed.
2. Refer to Drawing B-XC120 and Geotechnical Report page 4, Table 3.3.1 Seismic Parameters. There is a discrepancy in the numbers, investigate and make revisions as needed.
3. Refer to Drawing S601 and Geotechnical Report page 4, Seismic Design Parameters. The Geotechnical Report says Site Class C to be used. The Structural Notes on Drawing S601 notes Site Class D. Investigate and make changes as needed.
4. Submit documentation regarding implementation of Special Inspections and Testing program during construction to observe compliance with the Design Concepts and Specifications.
5. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.
6. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed.
AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
1. Provide galvanized bolts on the exposed steel framing connections.
2. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed. Where steel joists are used with columns that are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. Where constructability does not allow a steel joist to be installed at the column the joists are to be stabilized on both sides of the column.
3. Provide a vertical stabilizer plate at columns for steel joist as required by OSHA 1926.757.
4. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E001: Could not locate Keyed Note #14
E004: No plan notes actually on the sheet.
E005: No security shown. Not needed for electrical permit.
E104: Could not locate Plan Note #4.
E602: May need to upsize conductors for item 217 as it is probably a continuous load.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Add restroom fixture spacing measurements to plan page P201 or A214. -IPC 404.2, 405.3.1
2). Condensate waste on plan page P101 can't discharge to waste receptors connected to the grease system. -IPC 1003.2
3). #612 Handsink on plan page P202 detail #F11 can't discharge indirectly -IPC802.1
4). Steam & oven drains on plan page P202 need to comply with -IPC 702.5 if discharge is over 140 Deg.
5). P511 detail A13 pump discharge line needs a shut off valve on discharge side of check valve. -IPC 712.2, 1113.1.4
6). What is considered the secondary roof drainage system for the 2 canopy areas shown on plan page A130 & P104? -IPC 1108
7). Notate on P104 the total GPM or square footage the 3" canopy roof drains will be handling. -IPC 1106.2
8). Add the piping materials for water, sanitary, storm to the plumbing plans or supply spec manual. - IPC Chapter 6, 7, 11


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
12/12/2022 Fire New Construction REQUIRES RESUBMIT Development Package shows that the building will have fire sprinklers installed, correct sheet N101 to show fire sprinklers and fire alarm to be installed and a permit obtained from TFD. Add notes that owner shall obtain an operational permit from TFD for flammable and combustible liquids. Ower shall also obtain a construction permit from TFD for Fuel Island and below grade tanks.


Questions:
Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
11/22/2022 Site Engineering REQUIRES RESUBMIT See Zoning Comment
11/02/2022 Site Zoning REQUIRES RESUBMIT CDRC Transmittal

FROM: Loran Shamis, MBA; Lead Planner
PDSD Zoning Review Section

PROJECT: T22CM07932
QuickTrip No 1499 (1st review)
Pump Station Canopy


TRANSMITTAL DATE: October 25, 2022

DUE DATE: November 9, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


01. COMMENT: Zoning has done a cursory review of the building plans and although the site plan appears to match the associated development package, zoning cannot approve the building plans until DP22-0074 has been approved and the building plans have been reviewed for consistency.

For questions regarding Zoning comments, please contact me at: Loran.Shamis@tucsonaz.gov