Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM07655
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2022 | Fire New Construction | APPROVED | |||
| 11/02/2022 | Site Engineering | APPROVED | |||
| 11/02/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/02/2022 | External Reviewers - Willdan | REQUIRES RESUBMIT | Activity Number: T22CM07655 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. DENIED: Sheet A1, 2018 IBC Section 1705.2, 1705.3, 1705.12, and post installed anchors. Provide S.I.C. based upon scope. Sheet A1 2018 IBC 1803.2 Investigations required. Geotechnical investigations shall be conducted in accordance with Sections 1803.3 through 1803.5. Exception: The building official shall be permitted to waive the requirement for a geotechnical investigation where satisfactory data from adjacent areas is available that demonstrates an investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and Sections 1803.5.10 and 1803.5.11.A geotech investigation report has not been provided as part of the submittal for the deep pier foundations. Sheet A1, 2018 IBC Ch 3, Ch 10 and Ch11; No specific Architectural plans were submitted listing the Building Data, Use of the structure, or an Accessible Route. etc.. Sheet S3, 2018 IBC 1907.1 General. The thickness of concrete floor slabs supported directly on the ground shall be not less than 3 inches (89 mm). A 6-mil (0.006 inch; 0.15 mm) polyethylene vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab. A slab detail has not been provided. Sheet 2 Structural Analysis, 2018 IBC Ch. 35 Ref Standards and Section 1604.1General.Building, structures and parts thereof shall be designed and constructed in accordance with strength design, load and resistance factor design, allowable stress design, empirical design or conventional construction methods, as permitted by the applicable material chapters and referenced standards. Design to and reference in accordance with ASCE 7-16 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 10/28/2022 | Site Zoning | REQUIRES RESUBMIT | FROM: Samuel Rogers PDSD Zoning Review Section PROJECT: T22CM07655 (Project Number) Steel Shade Installation (1st Review) 8421 E WRIGHTSTOWN RD TRANSMITTAL DATE: 10/13/2022 DUE DATE: 10/31/2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Any proposed structures must be shown on a Development Package, a Development Package must be submitted and issued prior to the issuance of this permit. For minor changes to existing sites see the following: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf 02. COMMENT: Provide the square footage of the proposed structures in the foot print of the building. 03. COMMENT: More comments may be forthcoming upon the submittal of the Development Package. If you have any questions about this transmittal, Contact Samuel Rogers at Samuel.Rogers@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |