Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM07532
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/19/2022 | Commercial Plumbing | APPROVED | Water review | ||
11/03/2022 | Site Engineering | APPROVED | |||
11/03/2022 | Site Zoning | APPROVED | |||
12/19/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/23/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM07532 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Denied 1. Provide an updated or current occupant load for the TI. 2. Provide a list of deferred submittals that may be necessary. 3. Provide the existing fire protection schemes. Current fire sprinkler system? Current alarm system? MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E2.1 TRAVEL CENTER FLOOR PLAN - POWER: Could not located Keyed Note #1. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Add note to P1 that states "Any indirect waste piping exceeding lengths specified in IPC 802.3 shall be trapped" 2). 224,000 BTU Gas Dryer on plan page P2 needs combustion air. IFGC 304 3). Add a keynote & illustrations that show the required backflow locations at each piece beverage equipment at the drink counter on plan page P2 & update detail #2 on P3. -IPC 608.17.1 4). ES27 oven on plan page P2 & P4 needs backflow protection. -IPC 608.3 5). Lavs on P0.01 Fixture schedule need ASSE 1070 mixing valves -IPC 419.5 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
12/04/2022 | Fire New Construction | REVIEW COMPLETED |