Permit Number: T22CM07532
Parcel: 14037068J

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM07532
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/19/2022 Commercial Plumbing APPROVED Water review
11/03/2022 Site Engineering APPROVED
11/03/2022 Site Zoning APPROVED
12/19/2022 Bldg Permits - Post Review PENDING ASSIGNMENT
11/23/2022 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: T22CM07532

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.


BUILDING REVIEW COMMENTS:
Denied
1. Provide an updated or current occupant load for the TI.
2. Provide a list of deferred submittals that may be necessary.
3. Provide the existing fire protection schemes. Current fire sprinkler system? Current alarm system?


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E2.1 TRAVEL CENTER FLOOR PLAN - POWER: Could not located Keyed Note #1.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Add note to P1 that states "Any indirect waste piping exceeding lengths specified in IPC 802.3 shall be trapped"
2). 224,000 BTU Gas Dryer on plan page P2 needs combustion air. IFGC 304
3). Add a keynote & illustrations that show the required backflow locations at each piece beverage equipment at the drink counter on plan page P2 & update detail #2 on P3. -IPC 608.17.1
4). ES27 oven on plan page P2 & P4 needs backflow protection. -IPC 608.3
5). Lavs on P0.01 Fixture schedule need ASSE 1070 mixing valves -IPC 419.5


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov