| 11/07/2022 | Site Engineering | APPROVED | |||
| 11/07/2022 | Site Zoning | APPROVED | |||
| 11/07/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/07/2022 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Please designate branch circuits and panel for the new or relocated outlets, luminaires, devices, tankless water heater, Mechanical equipment in the restroom and warehouse/storage areas and correlate with the panel schedule. Including load calculations. 2 Show the location of the existing panel ‘OW’. 3 Provide a luminaire schedule for any new lighting. 4 If the Storage Building is a separate building (not attached) to the building where the main electrical service is located then it will be necessary to install or provide a Grounding Electrode System at the Storage Building and ground the new sub panel and building as required per NEC 250.32. 5 Provide a Main Circuit Breaker foe New Panel ‘W’. NEC 225.30, 225.30, 225.32, 230.6. If exception #1 applies, please specify this on the plan. 6 Verify lighting controls are existing for illumination of egess and occupancy in the restroom and storage building. IBC section 1008. IECC section 405. Ref; 2018 IBC sec 107.1,107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
||
| 11/07/2022 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Specify the air flow rate for the exhaust fan. Provide a minimum exhaust flow rate of 50 CFM per water closet if the exhaust is continuous, 70 CFM if the exhaust is intermittent. Reference: Section 403.3.1.1 and Table 403.3.1.1, IMC 2018. 2. Show how the restroom exhaust fan is to be controlled. Reference: Section 107.2.1, IBC 2018. 3. Provide electrical power for the water heater. Reference: Section 107.2.1, IBC 2018. |
||
| 11/07/2022 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the public restroom lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018. |
||
| 11/07/2022 | Commercial Structural | REQUIRES RESUBMIT | Activity Number: T22CM07464 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Denied Sheet A.1 Provide accessible path of travel to the office and accessible parking.What is being stored? If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 11/07/2022 | Fire New Construction | REQUIRES RESUBMIT | Plans shall show a detail of the scope of work, a complete code review ie: fire sprinklers?, fire alarm and so on. Provide a complete floor plan and exiting plan. Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |