Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM07460
Parcel: 132131240

Address:
3470 S KINO PW

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM07460
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/16/2024 Site Zoning APPROVED
04/16/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
04/01/2024 External Reviewers - Stantec REQUIRES RESUBMIT March 25, 2024
1st Review

Onyx I creative
Attn: David Garcia
22 E. Ventura Street
Tucson, Arizona 85705

Re: BRIDGES 3 - LOT 7
SHELL BUILDING

City of Tucson Permit Number: T22CM07460
Stantec Project Number: 185215066
Stantec File Number: TUC-24-029

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
M V-B 6,865 TBD Yes Yes
Separate Permits: Automatic fire sprinklers.
Deferred Submittals: Prefabricated ā€œIā€ joists.
Special Inspections: Earthwork, concrete, epoxy and expansion anchors, structural steel, high-strength bolts, field welding.

ARCHITECTURAL COMMENTS

Sheet A2.0

1. The architectural floor plan and the structural foundation plan on sheet S1.1 have conflicting door opening locations. The front door openings between tenant spaces 1 and 2 and tenant spaces 2 and 3 are 4ā€™ father apart than on the architectural floor plan. Please coordinate and revise. {I have also included this comment in the structural comments section}

STRUCTURAL COMMENTS

Sheet S1.1

1. The architectural floor plan and the structural foundation plan on sheet S1.1 have conflicting door opening locations. The front door openings between tenant spaces 1 and 2 and tenant spaces 2 and 3 are 4ā€™ father apart than on the architectural floor plan. Please coordinate and revise.

MECHANICAL COMMENTS

There are no comments.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
03/16/2024 PDSD Application Completeness REVIEW COMPLETED