Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - T22CM07308
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/01/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/01/2022 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Specify the materials of construction for the building sewer and the new vent. Reference: Section 702.3, IPC 2018. 2. Show the location of all cleanouts for the building sewer. The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Sections 703.5 and 708.1.1, IPC 2018 3. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow. Reference: Section 708.1.8, IPC 2018 4. Cleanouts shall open to allow cleaning in the direction of flow (keynote 1, downstream of existing 3” sewer line). Reference: Section 708.1.8, IPC 2018. 5. The installation of building traps is prohibited (Detail A1/CU501). Reference: Section 1002.6, IPC 2018. |