Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06476
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/15/2022 | Site Zoning | APPROVED | |||
| 01/10/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/10/2023 | External Reviewers - Pima County Addressing | REQUIRES RESUBMIT | Please contact Pima County Addressing unit Q is not in our system Phone #:520-724-9512 Email: addressing@pima.gov | ||
| 12/09/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM06475 & T22CM06476 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 27. Verify the plans on sheets E10.-E1.2 shall include the installation requirements for smoke detectors/alarms per code section 907.2.11.1 as follows: a)Permanently wired with battery backup power supply. b)When more than one smoke alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all the alarms in the unit. c)Smoke detectors shall be located as follows: i)Inside each bedroom. ii)In the immediate vicinity of the bedrooms. iii)On each story, including basements. iv)They shall be not less than 3' from the door opening of a bathroom. v)They shall be at least 20' from a cooking appliance. Per manufacturer’s specifications. vi)They shall be at least 3' from supply registers of heating/cooling systems. Per manufacturer’s specifications vii)They shall be at least 3' from the tip of the blade of a ceiling-mounted fan. Per manufacturer’s specifications MECHANICAL REVIEW COMMENTS: Conditionally Approved Although not shown, Clothes dryers shall be exhausted in accordance with the manufacturer's instructions. Dryer exhaust systems shall be independent of all other systems and shall convey the moisture and any products of combustion to the outside of the building as per IMC- 504.1 . Ducts shall not exceed the maximum length permitted. ELECTRICAL REVIEW COMMENTS Denied Verify the plans on sheets E10.-E1.2 shall include the installation requirements for smoke detectors/alarms per code section 907.2.11.1 as follows: a)Permanently wired with battery backup power supply. b)When more than one smoke alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all the alarms in the unit. c)Smoke detectors shall be located as follows: i)Inside each bedroom. ii)In the immediate vicinity of the bedrooms. iii)On each story, including basements. iv)They shall be not less than 3' from the door opening of a bathroom. v)They shall be at least 20' from a cooking appliance. Per manufacturer’s specifications. vi)They shall be at least 3' from supply registers of heating/cooling systems. Per manufacturer’s specifications vii)They shall be at least 3' from the tip of the blade of a ceiling-mounted fan. Per manufacturer’s specifications. PLUMBING REVIEW COMMENTS: Conditionally Approved 12. Provide the Individual and branch-type air admittance valves shall be located not less than 4 inches above the horizontal branch drain or fixture drain. Stack-type air admittance valves shall be located not less than 6 inches above the flood level rim of the highest fixture being vented. The air admittance valve shall be located within the maximum developed length permitted for the vent. The air admittance valve shall be installed not less than 6 inches above insulation materials as per IPC-918.4 Location If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 11/14/2022 | Commercial Plumbing | REVIEW COMPLETED | for water | ||
| 12/04/2022 | Fire New Construction | REVIEW COMPLETED | |||
| 11/14/2022 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 11/14/2022 | Site Engineering | REVIEW COMPLETED |