Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06474
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/20/2022 | Commercial Plumbing | APPROVED | Re-stamp required. | ||
01/20/2023 | External Reviewers - SAFEBuilt | APPROVED | Re-stamp required. | ||
12/01/2022 | External Reviewers - SAFEBuilt | APPROVED | NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. 1.Provide CO detectors to activate at 25 PPM and NO detectors to activate at 3 PP that will activate the ventilation system at .75 cfm per square foot, and this shall be noted on sheet M201 in the sequence of operation, and NO detector symbols shall be shown on the revised plans sheet M101 along with the Co detectors (MMC2018,404) Complied Approved/subject to field approval |
||
11/05/2022 | Fire New Construction | APPROVED | |||
11/05/2022 | Site Engineering | APPROVED | |||
11/05/2022 | Site Zoning | APPROVED | |||
12/02/2022 | Site Zoning | APPROVED | Re-stamp required. | ||
12/01/2022 | Site Engineering | NOT REQUIRED | Re-stamp required. | ||
01/20/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
11/05/2022 | Commercial Plumbing | REVIEW COMPLETED | For Water | ||
12/02/2022 | Fire New Construction | REVIEW COMPLETED | Re-stamp required. | ||
11/05/2022 | PDSD Application Completeness | REVIEW COMPLETED |