Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06357
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2022 | External Reviewers - Willdan | APPROVED | |||
10/28/2022 | Fire New Construction | APPROVED | |||
10/28/2022 | Site Engineering | APPROVED | |||
10/28/2022 | Site Zoning | APPROVED | |||
10/31/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/28/2022 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Please use the currently adopted 2018 IECC for the lighting power calculations. 2 Indicate the rating in amps for the OCPD in the existing panel feeding the 75KVA transformer. Also provide load calculations for this panel to verify it is withing rated capacity for the new load. 3 Exhaust fan #1 branch circuit (A2-ckt 5,7) does not correlate with the panel schedule. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
||
10/31/2022 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The condensate drains from RTU-1 and RTU-2 terminate at a plumbing vent for a hand sink. Condensate drains may not terminate at or over a plumbing vent. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson and Section 901.4, IPC 2018. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2018. 3. Per Table 403.3.1.1, IMC 2018, the occupant load for a dining area is 70 people per 1,000 square feet. Revise the occupancy load used for the dining area based on Table 403.3.1.1, IMC 2018, or an approved engineering analysis of the specific occupancy type. Reference: Section 403.3.1.1, IMC 2018. 4. Coordinate the outside air provided by RTU-1 in note #2 of the Ventilation Compliance table (100 CFM) with the results of the Ventilation Compliance calculation (280 CFM), the Kitchen Air Balance table (80 CFM), and the BOH Air Balance table (200 CFM). Reference: Section 107.2.1, IBC 2018. 5. Show that the hood installation complies with Section 507.2.6, IMC 2018 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall behind the hood and extending 18” beyond the hood. 6. The mechanical plan shows a high velocity diffuser in close proximity to the face of the Type I hood. Verify that the location and type of air outlets complies with the hood manufacturer’s installation instructions and does not reduce the effectiveness of the exhaust system. Reference: Sections 304.1 and 508.1, IMC 2018. |
||
10/28/2022 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 2. An approved two-way cleanout fitting is a listed single fitting, not field assembled as shown on sheet P0.05. Reference: Sections 707.1 (3), 708.1.3, and 708.1.8, IPC 2018 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |