Permit Number: T22CM06165
Parcel: 12901100A

Address:
2185 E 20TH ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM06165
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/27/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/27/2023 Commercial Electrical REQUIRES RESUBMIT Ref; Line Diagrams.

1 Indicate what device or equipment will be utilized to initiate the Rapid Shutdown function and apply the ‘Rapid Shutdown’ label to this device or equipment. NEC 690.56, 690.12(C). The Line Diagram shows the Rapid Shutdown Label at the New Electrical Service. What part of the New Service qualifies as the ‘Rapid Shutdown Initiation Device’ ?

2 Provide a complete grounding detail on the plans for the New Electrical Service per NEC art 250.

3 Verify that the existing electrical service was also fed overhead by the utility. If not a waiver will be required to change to overhead from the existing underground fed utility secondaries.

4 Indicate the riser conduit and conductor sizes and types for the new electrical service and verify properly sized for service load. NEC arts 220, 230.23.

5 Show conduit and conductor sizes and types between the new service CT cabinet and the new Gutter Box.

6 Provide complete Electrical Service Load Calculations.

7 Indicate what the new Service Main Disconnects are feeding.

8 Ref; Plan sheet E-07. Where is the ‘1200 Amp Main Breaker’ as indicated in the OCPD CALCULATION note with the red cloud around it?

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.