Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM06136
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/14/2023 | Air Balancing/Commissioning Report (Deferred Submittal) | APPROVED | |||
03/14/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/14/2023 | Water Sterilization Report (Deferred Submittal) | REQUIRES RESUBMIT | The required water disinfection report is not simply a narrative of the chlorination of the water distribution piping. Your report should contain the results of a bacteriological examination by a licensed testing laboratory of the water in the distribution system after the chlorine has been purged from the system. Section 610.1 of the 2018 International Plumbing Code describes the testing requirements. |