Permit Number: T22CM05921
Parcel: 126071540

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM05921
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/17/2022 External Reviewers - Willdan APPROVED
10/28/2022 Fire New Construction APPROVED
10/28/2022 Site Engineering APPROVED
10/28/2022 Site Zoning APPROVED
11/17/2022 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/01/2022 Commercial Electrical REQUIRES RESUBMIT Previous electrical plan review comments not addressed. 1. Provide complete electrical power and lighting plans showing all electrical changes and or additional electrical power, devices and lighting that complies with the 2017 NEC.
2. Also provide compliance with the 2018 IECC for the lighting.
3. Provide compliance with the 2012 City of Tucson/Pima County Outdoor Lighting Code for the exterior lighting modifications.
Ref 2018 IBC section 107.2.1, 2017 NEC, 2012 Tucson Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements.
11/01/2022 Commercial Mechanical REQUIRES RESUBMIT The existing mechanical system was approved under the 2012 International Mechanical Code as a mercantile occupancy. The current code, the 2018 International Mechanical Code, was adopted and became effective on January 1, 2019. As a change in occupancy, the proposed changes to the building must comply with the current codes. [Initial comment: Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018.]
11/01/2022 Commercial Plumbing REQUIRES RESUBMIT 1. Comment not addressed. Provide the size of both the water service meter and the reduced pressure backflow preventer assembly [Initial comment: Provide the size of both the water service meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.]
2. Specify the tankless water heaters that will be installed. Show how tempered water will be delivered to the two lavatories using a water temperature-limiting device that conforms to ASSE 1070. The relocated lavatory shall be provided with a metering faucet that will dispense a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 107.2.1, IBC 2018; Section 419.6, IPC 2018, as amended by the City of Tucson; Section 607.1.2, IPC 2018; and Section 606.4, ICC/ANSI A117.1-09. [Initial comment: The existing water heater is being removed. Show how the remaining lavatories and the relocated sink are to be supplied with hot or tempered water. Reference: Section 607.1, IPC 2018.]