Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05859
Parcel: 140360170

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM05859
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/08/2022 Fire New Construction APPROVED
12/15/2022 Bldg Permits - Post Review PENDING ASSIGNMENT
12/15/2022 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: T22CM05856 T22CM05857 T22CM05858 T22CM05859

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
DENIED
In this response, Structural notes have been changed from Site class "C" to Site Class "D" per earlier comments but this change should have been accompanied with a statement from the Structural Engineer if no changes were required to the Structural Design as a result of this change or else the revised calcs/ design should have been submitted. There were no explanations/ revised documents attached, please provide the response as enumerated here.
Furthermore, no changes were marked in the Structural Steel Sections of the drawings to address earlier review comments related to Structural Steel.


BUILDING REVIEW COMMENTS:
APPROVED


MECHANICAL REVIEW COMMENTS:
CONDITIONALLY APPROVED
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS:
CONDITIONALLY APPROVED
E4.1:
Would suggest Architect rename Pool Yard room 424 to something more appropriate when this room has the SES-C switchboard.
Should state than Panels C and P (Pool) are on Sheet E4.4
E4.2: Should have emergency lighting in Bath rooms, Café and Game room.
E4.5: Fault current calculation for F3 mislabeled as a 2nd F2.
E6.1: Panel DW shall be NEMA 3R.
E7.2: Pool, electrical room, and bathrooms should all have emergency lighting.


PLUMBING REVIEW COMMENTS:
DENIED
Second Plumbing Review: Comment #6
1).OK
2). Ok
3). OK -Clubhouse gas BBQ's on P4.4 need exhaust hoods above due to being below structure shown on plan pages A4.0 & A4.3 -IFGC 623.5 **Plan page A4.3 Revised Open air above BBQ**
4). OK- Ramada gas BBQ's on P3.0 need exhaust hoods above due to being below structure shown on plan pages A3.1 - IFGC 623.5 **Plan page A3.1 Revised Open air above BBQ**
5). OK -Outdoor sink on plan page P3.0 can't receive storm water. -IPC 1101.3 ** Plan Page P3.0 Added Sink Cover **
6). SAME- Provide civil site utility plan for continuation of water, sewer, fire line, & gas. as stated on plan pages P1.0, P2.0, P3.0, P4.1 - IPC 106.3.1 ** Pages not attached**
7).OK



If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
11/29/2022 Site Engineering REQUIRES RESUBMIT See Zoning Comment
11/14/2022 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL



FROM: PDSD Zoning Review



PROJECT:



T22CM05856, T22CM05857, T22CM05859 & T22CM05856

5125 E Valencia Crossing Dr – PAD-21 - (2nd Review)



TRANSMITTAL: August 12, 2022

This site is located in PAD-21.



Zoning has reviewed the building plans for compliance with DP22-0038 and although the building plans appear to match the DP in regard to building shape, size and height Zoning cannot approved the building plans until the DP is approved and the following comment is addressed.



This comment was not addressed. DP22-0038 shows no reference to the bike repair and dog wash. Clarify if this use will be strictly for the tenants of the apartment complex or if it will be open for the public. If for the tenants only it needs to be referenced as and accessory use on the DP. If for the public it needs to be referenced on the DP and the development standards, i.e. vehicle & bicycle parking etc. need to be revised.



If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
11/08/2022 Commercial Plumbing REVIEW COMPLETED water
11/08/2022 PDSD Application Completeness REVIEW COMPLETED