Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM05463
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/16/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/16/2024 | Special Inspection Certificate Review (Deferred Submittal) | REQUIRES RESUBMIT | T22CM05463 • Special Inspection Certificate Review (Deferred Submittal) Two of the PT tendon elongations (#10, 21) are outside of the maximum allowable range. Provide a letter from the EOR stating that is acceptable. Or the EOR shall provide a design fix if necessary. |
||
08/15/2024 | PDSD Application Completeness | REVIEW COMPLETED |