Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T22CM05423
Parcel: 127111300

Address:
808 N SONOITA AV

Review Status: Approved

Review Details: HAST - RESIDENTIAL ADD/ALT FAST TRACK v.1

Permit Number - T22CM05423
Review Name: HAST - RESIDENTIAL ADD/ALT FAST TRACK v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
07/25/2022 Site Zoning APPROVED {Activity date: 07/25/2022; Status: Approved; Reviewer: WBERGER1; Title: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO; Comment: }
11/20/2025 Bldg Permits - Post Review Express REVIEW COMPLETED
11/20/2025 PDSD Application Completeness Express REVIEW COMPLETED
07/25/2022 Residential Building REVIEW COMPLETED 2ND PARTY REVIEWED-{Activity date: 09/21/2022; Status: Completed; Reviewer: SAFEBUILT; Title: RESUBMITTAL; Comment: } ; {Activity date: 07/30/2022; Status: Reqs Change; Reviewer: DBENOIT1; Title: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO; Comment: Activity Number: T22CM05423GENERAL: Provide written responses to all review comments.Provide a complete plan set.Provide additional documents as requested by review staff.STRUCTURAL REVIEW COMMENTS:Denied1. Indicate the designed live and dead loads for the structure on the drawings as well as a basic designed wind speed of 115 mph and a seismic category B. 2018 IRC table R301.2(1) as amended.2. Provide foundation details that indicate the size and depth of the new footings. Indicate how the new footing will tie into the existing crawl space structure.3. Indicate the size of a new beam for the new wall opening on the drawings in the master bedroom. It appears that the existing roof is being supported by the exterior wall that is being removed.4. Indicate that the soil under the slab and around the footings will be treated for termites prior to the pouring of the concrete. 2018 IRC R318.BUILDING REVIEW COMMENTS:Denied1. The drawings indicate there is an existing window in the bathroom that will now be in the garage. Clarify how this window will conform with the fire separation requirement from house to garage. 2018 IRC R302.5.2. Provide a stair detail or notes indicate the rise and run for the new steps.3. Provide a landing outside of the new master bath door that is a minimum of 36” deep in the direction of travel and at least as wide as the door it serves. 2018 IRC R311.3.4. Indicate the required window energy requirements on the drawings. Windows are required to have a minimum U factor of .40 and a SHGC of .25. 2018 IECC table R402.1.2.5. Indicate on the drawings that fireblocking will be installed to cut off both vertical and horizontal concealed draft openings between stories and attic or roof area. 2018 IRC R302.11.MECHANICAL REVIEW COMMENTS:ApprovedELECTRICAL REVIEW COMMENTSDenied1. Note that all new or replaced 15- and 20-amp outlets shall be tamper proof type. 2017 NEC 210.52.2. Note that a minimum of 90% of all lighting fixtures in the dwelling will contain high-efficacy lamps. 2018 IECC R404.1.3. Note that the new can lighting installed in the ceiling will be IC rated and sealed for energy efficiency requirements. 2017 NEC 410.664. Indicate the location of the smoke detectors in the existing house and the new addition. Smoke detectors shall be installed in each sleeping room, outside of each sleeping room in the immediate vicinity of the bedroom. 2018 IRC R314.2. All smoke detectors shall receive their primary power from the building wiring with a battery backup and shall be interconnected so that the actuation of one alarm will activate all. 2018 IRC R314.4.5. Indicate the location of carbon monoxide detectors in the existing house. Carbon monoxide detectors shall be installed outside of each sleeping area in the immediate vicinity of the bedrooms. 2018 IRC R315.3. Carbon monoxide devices shall receive their primary power from the building wiring with a battery backup and shall be interconnected so that the actuation of one alarm will activate all. 2018 IRC R314.4. Smoke detectors and carbon monoxide alarms may be combined.PLUMBING REVIEW COMMENTS:Denied1. Note on the drawings that all plumbing drain, waste and vent systems shall be tested for leaks in accordance with the 2018 IRC P2503.5 prior to concealing.2. Note on the drawings that all hot water lines will be insulated to a minimum of R3 2018 IRC N1103.4.If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov}
07/25/2022 Site Engineering REVIEW COMPLETED {Activity date: 07/25/2022; Status: Passed; Reviewer: WBERGER1; Title: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO; Comment: }
07/25/2022 Site Landscape REVIEW COMPLETED {Activity date: 07/25/2022; Status: Passed; Reviewer: WBERGER1; Title: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO; Comment: }