Permit Number: T22CM05108
Parcel: 121080610

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM05108
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
03/08/2023 External Reviewers - SAFEBuilt APPROVED Activity Number: T22CM05106/BLDG #1 T22CM05107/BLDG #2 T22CM05108/BLDG #3 T22CM05109/BLDG #4

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
1. Provide make up air for laundry room in an approved manner, if the HVAC unit is providing make up air then it shall be interlocked to the dryers and noted as such sheet M101 (IMC2018,504.6) Complied
2. All HVAC unit's shall be labeled on the mechanical HVAC Plan (e.g. AC-1, AC-2 etc.). sheet M101 (IMC2018,106.3.1) Complied
3. Exhaust method ventilation shall operate continuous at all times. you are not clear when you say that there is an on/off switch for the bathroom exhaust fans, that you are using for ventilation of the units on note 5, tenants shall not have the option of turning the ventilation off. sheet M201 (IMC2018,405.1) Complied


ELECTRICAL REVIEW COMMENTS
Approved


PLUMBING REVIEW COMMENTS:
Conditionally Approved
Third Plumbing Review: OK Subject To Field Inspections
1 thru 3 OK
4).OK- See Attached letter From Pima County Waste water Control-Community Bldg. kitchen sinks need to discharge thru grease interceptor. -IPC 1003.1 ** Comment response states approval letter from utility authority was attached**
5 thru 7 OK


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
03/22/2023 External Reviewers - SAFEBuilt APPROVED Re-stamp required.
03/16/2023 Site Engineering APPROVED
03/14/2023 Site Zoning APPROVED
03/23/2023 Bldg Permits - Post Review REVIEW COMPLETED
03/14/2023 Fire New Construction REVIEW COMPLETED