Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM05107
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM05106/BLDG #1 T22CM05107/BLDG #2 T22CM05108/BLDG #3 T22CM05109/BLDG #4 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved 1. Provide make up air for laundry room in an approved manner, if the HVAC unit is providing make up air then it shall be interlocked to the dryers and noted as such sheet M101 (IMC2018,504.6) Complied 2. All HVAC unit's shall be labeled on the mechanical HVAC Plan (e.g. AC-1, AC-2 etc.). sheet M101 (IMC2018,106.3.1) Complied 3. Exhaust method ventilation shall operate continuous at all times. you are not clear when you say that there is an on/off switch for the bathroom exhaust fans, that you are using for ventilation of the units on note 5, tenants shall not have the option of turning the ventilation off. sheet M201 (IMC2018,405.1) Complied ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Conditionally Approved Third Plumbing Review: OK Subject To Field Inspections 1 thru 3 OK 4).OK- See Attached letter From Pima County Waste water Control-Community Bldg. kitchen sinks need to discharge thru grease interceptor. -IPC 1003.1 ** Comment response states approval letter from utility authority was attached** 5 thru 7 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
03/22/2023 | External Reviewers - SAFEBuilt | APPROVED | Re-stamp required. | ||
03/16/2023 | Site Engineering | APPROVED | |||
03/14/2023 | Site Zoning | APPROVED | |||
03/22/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
03/14/2023 | Fire New Construction | REVIEW COMPLETED |