Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM05012
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/01/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/01/2024 | Post-Tension Inspection (Deferred Submittal) | REQUIRES RESUBMIT | Post Tension Concrete specification strength within structural drawings is 3,000 psi, four locations are below 3,000 psi (as low as 2,317 psi). Please have Project Structural Engineer review and obtain his recommendation (should he/she decides to approve this report, a seal/signature/date will be required on the Hammer Test result report along with his statement for accepting the test result). | ||
02/27/2024 | PDSD Application Completeness | REVIEW COMPLETED |