Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM04989
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/31/2022 | Commercial Plumbing | APPROVED | |||
11/18/2022 | Commercial Plumbing | APPROVED | Re-stamp required | ||
11/22/2022 | Commercial Plumbing | APPROVED | Water Stamp | ||
11/07/2022 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM04989 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved Structural comment about lateral adequacy of the wall after new door opening has been addressed through a judgement opinion of the design architect that the opening size is small enough to cause any structural concern. Judgement opinions are normally accepted as an acceptable method of evaluation but that document needs to be issued under the seal and signature of the design professional making that judgement call. The signed and stamped letter has not been provided but, this letter could be issued later on and to not hold the approval process any further, structural review is being approved with the condition that a stamped and signed letter from the design professional needs to be provided stating the judgement opinion as stated in this response. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E-131 FLOOR PLAN - ETHERNET SYSTEM: No data drops for exam rooms? E-631 PANEL SCHEDULES: No electrical issues, LCPR may need its feeder and 70 amp CB to be upgraded as it has a calculated 66-amp load. PLUMBING REVIEW COMMENTS: Approved Third Plumbing Review: OK Subject to Field Inspections 1 thru 4 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
10/31/2022 | Fire New Construction | APPROVED | |||
10/31/2022 | Site Engineering | APPROVED | |||
10/31/2022 | Site Zoning | APPROVED | |||
11/21/2022 | Site Zoning | APPROVED | Re-stamp required | ||
11/23/2022 | Bldg Permits - Post Review | REVIEW COMPLETED | We will need a contractor with Arizona of Registrar Contractor License noted in contact that is qualified to preform the scope of work. | ||
11/21/2022 | Fire New Construction | REVIEW COMPLETED | Re-stamp required | ||
11/22/2022 | Fire New Construction | REVIEW COMPLETED | Re-stamp required. Please stamp the file/s that are noted (Re-stamp required). |