Permit Number: T22CM04989
Parcel: 13355230B

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM04989
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
10/31/2022 Commercial Plumbing APPROVED
11/18/2022 Commercial Plumbing APPROVED Re-stamp required
11/22/2022 Commercial Plumbing APPROVED Water Stamp
11/07/2022 External Reviewers - SAFEBuilt APPROVED Activity Number: T22CM04989

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
Structural comment about lateral adequacy of the wall after new door opening has been addressed through a judgement opinion of the design architect that the opening size is small enough to cause any structural concern. Judgement opinions are normally accepted as an acceptable method of evaluation but that document needs to be issued under the seal and signature of the design professional making that judgement call. The signed and stamped letter has not been provided but, this letter could be issued later on and to not hold the approval process any further, structural review is being approved with the condition that a stamped and signed letter from the design professional needs to be provided stating the judgement opinion as stated in this response.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E-131 FLOOR PLAN - ETHERNET SYSTEM: No data drops for exam rooms?
E-631 PANEL SCHEDULES: No electrical issues, LCPR may need its feeder and 70 amp CB to be upgraded as it has a calculated 66-amp load.


PLUMBING REVIEW COMMENTS:
Approved
Third Plumbing Review: OK Subject to Field Inspections
1 thru 4 OK


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
10/31/2022 Fire New Construction APPROVED
10/31/2022 Site Engineering APPROVED
10/31/2022 Site Zoning APPROVED
11/21/2022 Site Zoning APPROVED Re-stamp required
11/23/2022 Bldg Permits - Post Review REVIEW COMPLETED We will need a contractor with Arizona of Registrar Contractor License noted in contact that is qualified to preform the scope of work.
11/21/2022 Fire New Construction REVIEW COMPLETED Re-stamp required
11/22/2022 Fire New Construction REVIEW COMPLETED Re-stamp required. Please stamp the file/s that are noted (Re-stamp required).