Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM04680
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/18/2024 | Water Sterilization Report (Deferred Submittal) | APPROVED | |||
03/18/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/18/2024 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | Provide an air balancing report to verify that the HVAC systems are capable of supplying and exhausting at least the minimum air flow rates called for in the design drawings. The balancing shall be performed by a qualified balancing contractor holding certification from the National Environmental Balancing Bureau (NEBB), the Associated Air Balance Council (AABC), or other approved agencies. Reference: Section 403.3.1.5, IMC 2018, as amended by the City of Tucson. | ||
03/16/2024 | PDSD Application Completeness | REVIEW COMPLETED |