Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM04680
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/14/2023 | Commercial Mechanical | APPROVED | |||
06/15/2023 | Commercial Structural | APPROVED | |||
05/25/2023 | Site Engineering | APPROVED | |||
06/15/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/12/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. The scope of work per the submitted ‘Revision Narrative’ is Delta #1 Owner Changes. Please reflect this in the electrical plans or clarify with an electrical scope of work description. The comments below are based on electrical work shown on the electrical plans is assumed to be new work. 1 Please show the location of panel ‘B’ on the power floor plan. 2 The electrical line diagram and electrical floor plan show an AC Unit #8. However, this unit is not shown on the mechanical plan. Is this part of the scope of work for this project? 3 Ref; Power plan. Show branch circuit and controls for EF #1. Ref; 2018 IBC, 2017 NEC. |
||
06/14/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the “Preliminary, not for Construction” label from the drawings.). Reference: Section 107.2.1, IBC 2018. | ||
05/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/12/2023 | PDSD Application Completeness | REVIEW COMPLETED | |||
05/16/2023 | Site Landscape | REVIEW COMPLETED |