Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.2
Permit Number - T22CM04577
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/19/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/19/2023 | Commercial Electrical | REQUIRES RESUBMIT | 1. The Utility company is not responsible for designing the secondary conduit and conductor sizes required for the service secondary feeders utilizing a 3- phase ac system. Please indicate secondary conduit, conductor sizes and types in the Electrical Line Diagram. 2. Verify that the existing meter can is rated for the increase in ampacity desired to 600 amps. Indicate this on the Electrical Line Diagram. 3. Revise the grounding electrode conductor size(s) to comply with NEC art 250.66. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
01/09/2023 | PDSD Application Completeness | REVIEW COMPLETED |