Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - T22CM04501
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2023 | Air Balancing/Commissioning Report (Deferred Submittal) | APPROVED | |||
09/21/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/21/2023 | Other Inspection Reports (Deferred Submittal) | REQUIRES RESUBMIT | The following Special Inspections are absent: 1. Welding Special Inspections (3 welding inspections) 2. Outdoor Lighting special inspection 3. Water Sterilization special inspection Please submit the above. |
||
09/20/2023 | Water Sterilization Report (Deferred Submittal) | REQUIRES RESUBMIT | Clarify how and where the water sample was obtained. The purpose of the test is to determine the condition of the water distribution system, not the water entering the building from the water service. Your report should contain a narrative of what water distribution system was tested and the method used to disinfect the water distribution system as well as the report of the bacteriological examination by a licensed testing laboratory. Reference: Section 610.1, IPC 2018. | ||
09/20/2023 | Concrete Installation Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
09/21/2023 | County Health Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
09/20/2023 | Masonry Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
09/20/2023 | PDSD Application Completeness | REVIEW COMPLETED | |||
09/20/2023 | Post-Installed Anchor Inspection (Deferred Submittal) | REVIEW COMPLETED |