Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM04440
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/07/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Comment not resolved; the 3-compartment sink requires indirect waste connections for each of the three sink compartments [Second comment: Clarify the installation of the hydromechanical grease interceptor. The specified grease interceptor requires the installation of a vented flow control device at the inlet of the interceptor, a vent downstream of the interceptor and a cleanout downstream of the interceptor. In addition, the 3-compartment sink requires indirect waste connections for each of the three sink compartments.] [Initial comment: Verify if an existing grease interceptor is currently in place to prevent the discharge of fats, oil, and grease into the public sewer. If a grease interceptor is not in place, show how the public sewer is to be protected from harmful discharges. Reference: Section 1003.1, IPC 2018.] | ||
| 02/18/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |