Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - T22CM04385
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/19/2022 | Fire New Construction | APPROVED | |||
| 12/19/2022 | Site Zoning | APPROVED | |||
| 12/29/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/29/2022 | Commercial Electrical | REQUIRES RESUBMIT | 1 Provide 2 – 8' ground rods for the grounding electrode as well as the Gas and Water bonding at the electrical service and at the new office if it is not attached to the 200 amp service. NEC 250.32, 250.50. 2 Show the locations of the ‘Temp GFCI’ (s) and the ‘Welder Receptacles’. Show wiring methodes. 3 Provide details and plans for the ‘New Office’ if part of this permit. If not part of this permit, indicate this with a note on the plans. 4 How is the electric gate wired to the new panel ‘A’. Show wiring methods. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
| 12/19/2022 | Commercial Building | REVIEW COMPLETED | |||
| 12/19/2022 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 12/19/2022 | Site Engineering | REVIEW COMPLETED |