Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM03945
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/07/2022 | Fire New Construction | APPROVED | |||
12/14/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/14/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM03945 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The response letter state that sprinkler system has been added, however, Sheet G003 states that no sprinkler system is being installed. A sprinkler system would be required to qualify for unlimited area for an S-1 occupancy. The section provided on G-003 does not apply to this project as it only applies to S-2 occupancies. Provide a sprinkler system in accordance with Section 903.2.9. MECHANICAL REVIEW COMMENTS: Denied 1. Provide ventilation air schedule for all occupancies, and include how you are ventilating the warehouse (IMC2018,403.3.1.1.1) Complied 1. Provide ventilation calculations (IMC2018,,403.3.1.1.1) to show how you are going to meet the 4% openable area to the outdoors for natural ventilation Complied 2. Provide a detailed narrative on the process that occurs in the warehouse (e.g. what materials are you storing in the warehouse, what type of forklifts are you using in the warehouse is it fuel or electric) (imc2018,106.3.1) You did not provide a response for this correction Not Complied ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). Plan page C-208 Sanitary & Potable water Tie in locations don't correlate & Fire line on C-208 shows 4" but shows 6" on P-103. Pages need to correlate. -IPC 106.3.1 2).OK 3). OK 4). OK 5). SAME- water heater detail #11 on plan P-500 shows floor mounted installation, all other plumbing pages show elevated water heater. Plan pages need to correlate if elevated show support requirements & add pan to detail #11. -IPC 106.3.1 , 504.7 ** detail on P500 still shows floor mount water heater** If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
11/28/2022 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
11/09/2022 | Site Zoning | REQUIRES RESUBMIT | REVIEW TRANSMITTAL FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM03945 Building Plans (2nd Review) 4711 E VALENCIA RD Zoning PAD-21 TRANSMITTAL: November 9, 2022 1. Zoning has reviewed the building plans for compliance with the associated unapproved Development Package DP22-0147. Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
11/07/2022 | Commercial Plumbing | REVIEW COMPLETED | Water | ||
11/07/2022 | PDSD Application Completeness | REVIEW COMPLETED |