Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM03945
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/18/2024 | Water Sterilization Report (Deferred Submittal) | APPROVED | |||
12/18/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/18/2024 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | The heat pump split system,FC-2, has only 29% of the required outside airflow. Correct the deficiency and resubmit the report. Reference: Sections 403.3.1.2 and 403.3.1.5, IMC 2018. | ||
12/18/2024 | Concrete Installation Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
12/18/2024 | Masonry Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
12/18/2024 | Other Inspection Reports (Deferred Submittal) | REVIEW COMPLETED | BOLTS IN CONCRETE | ||
12/18/2024 | Other Inspection Reports (Deferred Submittal) | REVIEW COMPLETED | HIGH STRENGTH BOLTING | ||
12/18/2024 | Other Inspection Reports (Deferred Submittal) | REVIEW COMPLETED | REINFORCING STEEL | ||
12/18/2024 | PDSD Application Completeness | REVIEW COMPLETED | |||
12/18/2024 | Post-Installed Anchor Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
12/18/2024 | Site Prep Inspection (Deferred Submittal) | REVIEW COMPLETED |