Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM03715
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/14/2023 | Site Engineering | NOT REQUIRED | |||
12/15/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/27/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural N/A Building N/A Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 11/20/2023 6:25:04 PM 1. General - Provide Ventilation Calculations/Schedule as per 2018 IMC 403.3.1.1 - 2018 IECC C403.2.2 2. Provide roof plans. Show locations of equipment on roof. Confirm Fresh air to exhaust clearances. Confirm requirements of guards for equipment within 10' of edge of building. 2018 IMC 304.11 Guards - 2018 IBC Section [A]107.2.1Information on construction documents. 3. Provide Energy Calculations - 2018 IECC Section C403 and Section C103 4. Provide Equipment (Condensers) Tie down specifications - 2018 IMC 301.15, 301.16 and 301.18 5. Provide Walk in Freezer Evaporator support diagram. 2018 IBC Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 11/26/2023 10:38:00 AM By: Ron Ross PE E3.1: Should call out or show circuit for receptacle and call out that it is WP and GFCI protected as shown on sheet E3.2. E4.1: Missing Keynote 14. Probably should be removed/deleted. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/26/2023 9:43:40 PM First Revised Plumbing Review: 1). provide original plans for reference-IPC 106.3.1 2). Revised plumbing plans need to be signed & sealed by the design professional. -IPC 106.3.1 3). Plan page P1 missing water piping illustrations to hose bibs - IPC 106.3.1 4). Provide detail for wall drains shown on plan page P1 -IPC 106.3.1 5). Not clear what is discharging to the wall drains on plan page P1? The same page shows the condensate drains discharging to exterior & nothing shown to wall drains? -IPC 106..3.1 |
||
12/15/2023 | Site Zoning | REQUIRES RESUBMIT | CDRC Transmittal FROM: Loran Shamis, MBA; Lead Planner PDSD Zoning Review Section PROJECT: T22CM03715 Tenant Improvement (1st review) 845 E Ohio St Unit 107 TRANSMITTAL DATE: December 15, 2023 DUE DATE: December 16, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: The proposed tenant improvement is an expansion of the existing Retail - Marijuana Dispensary Off-site Cultivation Location and requires a valid Marijuana Use Authorization Letter to proceed with permitting this expansion. To apply for the Marijuana Use Authorization Letter, visit the Tucson Development Center online - https://tdc-online.tucsonaz.gov/#/home 2. COMMENT: An odor mitigation plan that meets the requirements of UDC 4.9.9.E.2.k (1) Odor mitigation devices and techniques shall be incorporated in all marijuana facilities to ensure that odors are mitigated. As such, this may be done through an exhaust air filtration system with odor control that prevents internal odors from being emitted externally or through any other best practices deemed adequate for odor mitigation as determined by the Zoning Administrator. (2) An odor mitigation plan shall be submitted demonstrating compliance with odor control requirements. When a modification is made to a marijuana facility, or the facility operation, that has the potential to impact the nature or degree of odor, or affects the control of odor, and UDC requirements for bringing the entire site up to code per Sections 7.4.3.E, 7.5.3.E, 7.6.2.B & 9.2.2, the marijuana facility owner must update its odor mitigation plan within 30 days of facility modification. Failure to submit an updated odor mitigation plan within 30 days of facility modification is a violation of this section and shall be a civil infraction. (3) Upon receipt of a formal complaint through code enforcement related to a marijuana facility's odor, an inspection for compliance with the odor mitigation plan shall be conducted. If an inspection reveals that the existing odor mitigation plan does not comply with the odor mitigation plan for the marijuana facility or marijuana facility's cultivation site, code enforcement shall provide the owner or person in charge with a notice of deficiencies and the owner or person in charge will be required to bring facility into compliance with the approved odor mitigation plan. For questions regarding Zoning comments, please contact me at: Loran.Shamis@tucsonaz.gov |
||
12/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
11/15/2023 | PDSD Application Completeness | REVIEW COMPLETED |