Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM03546
Parcel: 10304001X

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM03546
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/24/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
04/10/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: T22CM03546

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E-4.1 ONE LINE DIAGRAM - WEST SERVICE: Keynote 5 calls out for a 400 amp panel vs MCB and dedicated note ‘SLW’ calls out for this panel as 600 amps. Correct/coordinate panel schedule with One Line.
ES-1.3 PARTIAL ELECTRICAL SITE PLAN: No keynote #11 provided.
ESD-1.1 PARTIAL ELECTRICAL SITE DEMOLITION PLAN: Missing Keynote #3


PLUMBING REVIEW COMMENTS:
Denied
Second Plumbing Review:
1). SAME-Lavatories need to be in the same room as the toilets- IPC 405.3.2, Update all affected pages
2). SAME -There need to be the same number of lavatories as there are toilets. -IPC 403.1.3, Update all affected pages
3). SAME-Drinking Fountain on plan page L-1.10 can't receive storm water & drinking fountain must connect to sanitary. -IPC 301.3 , 1101.3 ** Or Provide Approval letter from Building Official Allowing discharge to earth as shown**
4). SAME-Provide Civil utility piping for continuation of sewer & water services -IPC 106.3.1


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
04/24/2023 Site Engineering REQUIRES RESUBMIT See zoning comment
04/21/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: T22CM03546 Columbus Park (2nd Review)
3495 W EL CAMINO DEL CERRO Zoning RX-1

TRANSMITTAL DATE: April 21, 2023

1. COMMENT: Zoning has reviewed the building plan for compliance with DP22-0127 and although it appears that the building plans match the DP Zoning cannot approve the building plans until the DP is approved.


If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
03/28/2023 PDSD Application Completeness REVIEW COMPLETED