Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM03546
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2022 | Fire New Construction | APPROVED | |||
03/28/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
06/03/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM03546 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Structural steel, components and fasteners exposed to weather are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 3. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E-4.1 ONE LINE DIAGRAM - WEST SERVICE: Keynote 5 calls out for a 400 amp panel vs MCB and dedicated note ‘SLW’ calls out for this panel as 600 amps. Correct/coordinate panel schedule with One Line. ES-1.3 PARTIAL ELECTRICAL SITE PLAN: No keynote #11 provided. ESD-1.1 PARTIAL ELECTRICAL SITE DEMOLITION PLAN: Missing Keynote #3. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Lavatories need to be in the same room as the toilets- IPC 405.3.2, Update all affected pages 2). There need to be the same number of lavatories as there are toilets. -IPC 403.1.3, Update all affected pages 3). Drinking Fountain on plan page L-1.10 can't receive storm water & drinking fountain must connect to sanitary. -IPC 301.3 , 1101.3 4). Provide Civil utility piping for continuation of sewer & water services -IPC 106.3.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
06/21/2022 | Site Engineering | REQUIRES RESUBMIT | See Zoning comments | ||
06/16/2022 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM03546 Columbus Park (1st Review) 3495 W EL CAMINO DEL CERRO Zoning RX-1 TRANSMITTAL DATE: June 16, 2022 1.COMMENT: Zoning has reviewed the building plan for compliance with DP22-0127 and although it appears that the building plans match the DP Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
03/28/2023 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
06/13/2022 | Water - PDSD | REVIEW COMPLETED |