Permit Number: T22CM03352
Parcel: 136100960

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM03352
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/07/2023 Water - PDSD APPROVED MASTER SET LOCATED AT: T22CM03350 BLDG 4 (NEW BLDG 1) WITH REVIES TO BE PERFORMED ON: T22CM03351 BLDG 5 (NEW BLDG 2), T22CM03352 BLDG 6 (NEW BLDG 3), T22CM03353 BLDG 7 (NEW BLDG 4), T22CM03354 BLDG 8 (NEW BLDG 5), T22CM03355 BLDG 9 (NEW BLDG 6), T22CM03356 BLDG 10 (NEW BLDG 7), T22CM03357 BLDG 11 (NEW BLDG 8), T22CM03358 BLDG 12 (NEW BLDG 9)
Studio Session 964-315-252
11/07/2023 Bldg Permits - Post Review PENDING ASSIGNMENT MASTER SET LOCATED AT: T22CM03350 BLDG 4 (NEW BLDG 1) WITH REVIES TO BE PERFORMED ON: T22CM03351 BLDG 5 (NEW BLDG 2), T22CM03352 BLDG 6 (NEW BLDG 3), T22CM03353 BLDG 7 (NEW BLDG 4), T22CM03354 BLDG 8 (NEW BLDG 5), T22CM03355 BLDG 9 (NEW BLDG 6), T22CM03356 BLDG 10 (NEW BLDG 7), T22CM03357 BLDG 11 (NEW BLDG 8), T22CM03358 BLDG 12 (NEW BLDG 9)
Studio Session 964-315-252
10/31/2023 Fire New Construction REQUIRES RESUBMIT I don't understand the response to the fire comments. The only response is "noted."
john.vincent@tucsonaz.gov
5203495581



MASTER SET LOCATED AT: T22CM03350 BLDG 4 (NEW BLDG 1) WITH REVIES TO BE PERFORMED ON: T22CM03351 BLDG 5 (NEW BLDG 2), T22CM03352 BLDG 6 (NEW BLDG 3), T22CM03353 BLDG 7 (NEW BLDG 4), T22CM03354 BLDG 8 (NEW BLDG 5), T22CM03355 BLDG 9 (NEW BLDG 6), T22CM03356 BLDG 10 (NEW BLDG 7), T22CM03357 BLDG 11 (NEW BLDG 8), T22CM03358 BLDG 12 (NEW BLDG 9)
Studio Session 964-315-252
11/06/2023 Site Engineering REQUIRES RESUBMIT See zoning comment
10/27/2023 Site Zoning REQUIRES RESUBMIT PROJECT: T22CM03347, T22CM03348,T22CM03349, T22CM03350, T22CM03351 T22CM03352, T22CM03353, T22CM03354, T22CM03355, T22CM03356, T22CM03357, T22CM03358, T22CM03359, T22CM03360
Building plans (2nd Review)
2885 S HOUGHTON RD
Zoning SR

TRANSMITTAL: 10/27/2023

1. Zoning has reviewed the building plans for compliance with the associated unapproved Development Package DP21-0042. Zoning cannot approve the building plans until the DP is approved.

2.COMMENT: Ensure the footprint shown on the building plans for the buildings on the northwest of the property match that shown on the development package. Zoning cannot approve this project until the footprint, square footage, and height of each building is consistent with what is shown on the development package.

If you have any questions about this transmittal, Contact Iman Monshizadeh at Iman.Monshizadeh@tucsonaz.gov
10/27/2023 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/10/2022 6:25:06 PM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall
not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 8/10/2022 2:53:20 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/4/2022 11:22:03 AM
1. building 101a-105a not ready for buildout and part of this permit. Complied

2. Provide ventilation air to storage room in an approved manner sheet M201 (IMC2018,403.3.1.1). Complied

3. Provide return air to each room sheet 201 (IMC2018,403.1) Complied

4. Provide ventilation air schedule for building 1 sheet M201 (IMC2018,403.3.1.1). Complied

5. Provide 1,288 cfm of ventilation air you got 900 cfm coming in the square footage of building 4 is 21,460 square feet sheet M202 (IMC2018,403.3.1.1) Complied

6. Provide 859 cfm of ventilation air you got 600 cfm coming in the square footage of building 12 is 14,315 square feet sheet M203 (IMC2018,403.3.1.1) Complied

7. Provide a permanent means of access to equipment on building 1 & 2 where roof is above 16 feet from grade (IMC2018,306.5) Complied

8. Approved/Subject to field approval



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/3/2022 3:37:32 PM
2nd Electrical Response to Comments/Questions.
By: Ron Ross PE
E401 FIRST FLOOR SYSTEMS PLAN BUILDINGS 1 & 2:

Should relocate pull station at break room to front door of storage office.

E801 DETAILS, SCHEDULES & RISER DIAGRAMS: All of the Mini substations are called out to be 15 KVA 1 phase with 40 amp 2 pole CBs. However, ampacity for feeder tag 42C uses #2 AWG which is 100 amps of amp capacity. Not a code issue,
but may want to correct for IFC.



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/24/2023 9:06:30 PM
Third Plumbing review: OK Subject to field inspections
1 thru 4 OK

5).OK

6 thru 7 OK

8). OK Provide civil plans to show continuation of water, storm, & sanitary systems, and any onsite RV dump stations & water outlets. -IPC 106.3.1 ** Civil plans not provided or part of this plan set ,this will be subject to field inspections**
10/18/2023 PDSD Application Completeness REVIEW COMPLETED MASTER SET LOCATED AT: T22CM03350 BLDG 4 (NEW BLDG 1) WITH REVIES TO BE PERFORMED ON: T22CM03351 BLDG 5 (NEW BLDG 2), T22CM03352 BLDG 6 (NEW BLDG 3), T22CM03353 BLDG 7 (NEW BLDG 4), T22CM03354 BLDG 8 (NEW BLDG 5), T22CM03355 BLDG 9 (NEW BLDG 6), T22CM03356 BLDG 10 (NEW BLDG 7), T22CM03357 BLDG 11 (NEW BLDG 8), T22CM03358 BLDG 12 (NEW BLDG 9)