Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM02977
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/24/2023 | Commercial Structural | APPROVED | |||
04/11/2023 | Site Engineering | APPROVED | |||
04/11/2023 | Site Zoning | APPROVED | |||
04/24/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
04/19/2023 | Commercial Plumbing | REQUIRES RESUBMIT | The required water and sewer plan (C4.1) has been removed from the drawing set. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service to the building and the installation of the building sewer. The plan shall show that the installation of the water service and the building sewer comply with the relevant codes. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. [Initial comment: The maximum distance between cleanouts for the building sewer shall be 100-feet, measured along the developed pipe length from the opening of each cleanout to the next cleanout access point. Reference: Section 708.1.1, IPC 2018.] |