Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL SIMPLE REVIEW v.1
Permit Number - T22CM02226
Review Name: RESIDENTIAL SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2023 | Site Engineering | NOT REQUIRED | |||
09/20/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/20/2023 | Light Residential Building Review (OIP) | REQUIRES RESUBMIT | Permit Review T22CM02226 (5803 E FARMSTEAD DR TUCSON, AZ 85756) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC). 1. Clarify the intent of this permit. The submitted plans are for a solar installation, but the description on the permit states that this is a Main Service Panel upgrade. If this is intended to be a service panel upgrade only then you will need to resubmit only a site plan showing the location of the service panel to be upgraded. 2. The existing Solar installation on the roof is currently unpermitted and needs to complete its permit prior to approving a service panel upgrade. There are two expired permits via Pima County. 3. If this is a solar installation permit, then you will need to withdraw this permit and reapply for a solar permit with the complete solar plans. 4. TEP SR-702 (b) requires Solar DG disconnects switch to be within 10’ of customers revenue meter. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
09/20/2023 | PDSD Application Completeness | REVIEW COMPLETED |