Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - T22CM02001
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/16/2023 | PDSD Application Completeness Express | REQUIRES RESUBMIT | Commercial Electrical Daniel Santa Cruz Requires Resubmit 05/26/2023 05/28/2023 05/30/2023 Please address the electrical plan review comments and provide a written response. 1 Per the response letter dated 5-24-22, comment response #3 or #4 (no # before the response). It was stated “Existing Electrical Service is to be replaced”. The revised plan shows the New Unit exterior Breaker Panel as being replaced but no account for the ‘New Electrical service’. The ‘New Electrical Service’ was not shown on the electrical or site plan, and was an unintentional oversite. At any rate this item cannot be overlooked. If the ‘Electrical Service Equipment is proposed to be replaced, a complete Electrical Line Diagram will be required including all specifications such as Voltage, amp, AIC, phase, conduits, conductor sizes and types, feeders, a service grounding detail and grounding detail at the unit. Also show the location of the Electrical Service on the premises. 2 The HVAC equipment as reference also in the comments is not included in the electrical plan or panel schedule and load not accounted for. My apologies for any inconvenience. However, I'm sure the safeguarding of persons and property from the hazards arising from the use of electricity is in everyone's best interest. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC, 2012 City of Tucson Outdoor Lighting Code, City of Tucson Plan Submittal Requirements. Commercial Building Justino Eder Requires Resubmit 05/26/2023 05/28/2023 06/02/2023 Please respond to the following minor correction requests: 1. Shower or Bathtub is not shown on the Floor Plan, please add it to the plan. 2. The relationship between the sink and the water closer requires adjustment. R307.1 21 inch clearance in front of sink requires adjustment. R307.1 21 inch clearance in front of water closet (water closet and sink are facing each other with only a few inches in between them). 3. Please revise detail to reflect the following: Starting with detail A2 sheet A5.1 - A recessed channel in the exterior slab a minimum of 2 inches deep under the weep screed at the most shallow point, sloped to drain, and with a horizontal width projecting a minimum of one inch beyond the edge of the finished wall. Please correct this condition in every detail drawing and wall section detail where it occurs. 4.All exterior walls shall be continuously supported on a foundation or other approved structural system , minimum 12 inches below native soil surface. R403.1 Please confirm existing foundation exist with this requirement to accommodate taller walls with new roof. Wall detail A5 sheet A5.1 shows only 6 inch into native soil. 5. At New porch section drawing, please provide the roof pitch, sizes for the rafters, the beam and the posts, sheathing thickness and roofing material being used. |