Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM01271
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/09/2025 | External Reviewers - Stantec Express | REQUIRES RESUBMIT | April 8, 2025 1st Review CAP Storage Bridges, LLC. Attn: Jason Tankersley 935 S. Main Street, Suite 201 Greenville, South Carolina 29601 Re: CAP BRIDGES NEW BUILDING (DEFERRED SUBMITTAL: METAL STAIRS & STEEL STUD DESIGN) City of Tucson Permit Number: T22CM01271 Stantec Project Number: 185215066 Stantec File Number: TUC-25-041 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural and structural designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms S-1 II-B 105,991 210 Yes Yes Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: Metal stairs and metal stud design, Special Inspections: Earthwork, concrete, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, EFIS, and outdoor lighting. ARCHITECTURAL COMMENTS General 1. The steel wall framing plans are not reviewed and notated by the architect of record. There are multiple notes throughout the plan-set requesting the architect of record verifies details. [Ref. IBC 2018 Sec. 107.3.4.1] STRUCTURAL COMMENTS General 1. The steel stud framing plan does not appear to be designed with the latest set of construction documents. The wall elevations on the provided set differ from the latest set of construction documents with a revision date of 5/17/2024. Please update the steel framing plan with the latest set of construction documents. 2. The steel stair shop drawings include a note on the cover sheet that requests the structural calculations for the metal stair shop drawings as requested in General Note #18 on Sheet S200 of the structural construction documents by the engineer of record. Please provide the calculations to the engineer of record for his review and notation of compliance with design. [Ref. IBC 2018 Sec. 107.3.4.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 04/14/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | See Stantec Deferred Submittal Comments. | ||
| 04/07/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |