Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM01230
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/13/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM01230 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved 1. Sub-grade recommendations for engineered fill provided in the geotech report are not incorporated in the structural design details. Please provide revised foundation details after incorporating geotech recommendations for the sub-grade. response from the applicant: See revised Post-Tensioned Details – Sheet PT1.1. Second Review: Requested information could not be located in the response. ITEM OPEN 2. Structural design is based on ASCE 7-10 whereas the design standard needs to be ASCE 7-15 as the base design code is 2018 IBC. response from the applicant: Design Standard Revised – See Sheet PT1.0 Second Review: Revised Structural analysis not provided for review and confirmation. ITEM OPEN. 3. Is there a separate deferred submittal for post-tensioned slab design including the procedures for casting post-tensioned slab? Special Inspections shall be required for the casting of post-tensioned slab. response from the applicant: A Complete Post Tension Design is described in the Plans and Calculations provided. Special Inspections are noted on the Cover Sheet – T1.0 Second Review: information requested not provided for review. ITEM OPEN. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved 3. Provide fire dampers where any duct that penetrates the floor between the first and second floors sheet M1.2 (IMC2018, 607.6.1) Complied 3. Provide fire dampers where any duct that penetrates the floor between the first and second floors sheet M1.2 (IMC2018, 607.6.1) Not Complied You have a commercial restaurant on the 1st floor and a residential occupancy on the 2nd floor it must be separated by at least a 1 hour horizontal separation and any duct penetrations must be protected with a fire damper (IMC2018,607.6.1) Approved for live work unit per city of Tucson panning and development department per attached letter therefore it is Complied per city of Tucson 5. Provide beverage dispenser CO2 quantities and pipe plan (IMC2018,106.3.1) Not Complied not enough information given in your response in respect to the written correction Engineer states that there will be no beverage dispenser therefore this correction is complied All corrections are complied Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Conditionally Approved Fourth Plumbing Review: OK Subject To field Inspections 1). OK 2). OK 3). OK 4). ****OK Use of Hydromechanical GI Subject To field Inspections & Building Official**** Now that the grease interceptor has been added, a hydromechanical grease interceptor can't be used due to the amount of required fixtures that need to discharge to it on plan page P1.0 & P4.0 -Tucson Plumbing amendments. *****Based on comment response Please Provide letter from authority overriding Tucson Plumbing Amendments with signature of that person & title.***** B- OK 5 thru 31 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
03/23/2023 | Site Engineering | APPROVED | |||
03/21/2023 | Site Zoning | APPROVED | Re-stamp | ||
03/23/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
03/17/2023 | Fire New Construction | REVIEW COMPLETED | |||
03/01/2023 | PDSD Application Completeness | REVIEW COMPLETED |