Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEMOLITION v.1
Permit Number - T22BU00387
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/31/2022 | Fire New Construction | APPROVED | |||
| 10/31/2022 | Site Engineering | APPROVED | |||
| 03/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/31/2022 | Site Zoning | REQUIRES RESUBMIT | CDRC Transmittal FROM: Loran Shamis, MBA; Lead Planner PDSD Zoning Review Section PROJECT: T22BU00387 Multifamily Development – perimeter wall (1st review) 219 W Fort Lowell Rd TRANSMITTAL DATE: October 25, 2022 DUE DATE: November 10, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Per UDC 3.3.3.G.2.b, a site plan (development package) is required for the following types of development: Existing development undergoing a change of use, building of structure additions, and/or a reconfiguration of an outside area of a building. A development package meeting the following is required - https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf The development package is a separate submittal and is submitted at https://tdc-online.tucsonaz.gov/#/home 02. COMMENT: There is only one development package that will be active for the site. Please include all proposed improvements on the development package (including the fence proposed with T22BU00388) For questions regarding Zoning comments, please contact me at: Loran.Shamis@tucsonaz.gov |
||
| 03/27/2023 | External Reviewers - Willdan | REVIEW COMPLETED |