Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T21CM09778
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/13/2022 | Fire New Construction | APPROVED | |||
01/04/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/30/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T21CM09778 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: CONDITIONALLY APPROVED 1. No Geotechnical Report is provided and Presumptive Allowable Bearing Capacity of 1500 psf. is used in the design. The Engineer of Record to verify Soil Conditions on Site before Construction. BUILDING REVIEW COMMENTS: CONDITIONALLY APPROVED 1. Provide an existing occupant load. MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED 1. No mechanical plans submitted no new mechanical work being done 2. Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS APPROVED PLUMBING REVIEW COMMENTS: DENIED Second Plumbing Review 1). Now that downspout info has been added to plan pages A1 & A3 the in wall piping material types need to derive from IPC 1102.2 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
01/04/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
12/30/2022 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09778 1448 E 1st St – R-3 Façade Modifications (2nd Review) TRANSMITTAL DATE: December 30, 2022 This site is located in the R-3 zone (UDC 4.7.12). A group dwelling is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6. 1. Until DP22-0280 has been approved by all review agencies Zoning cannot approve the building plan. If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov. |
||
12/13/2022 | Commercial Plumbing | REVIEW COMPLETED | |||
12/13/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |